South Florida / Sources and standards

Construction cost evidence for South Florida

South Florida project costs depend on scope, property conditions, access and approvals. The table below presents five 2025 Miami benchmarks from JLC's Cost vs. Value report, with each model's scope. These are published modeled job costs, not SFC customer quotes, current contractor offers or measured prices for every South Florida city.

Call (844) 311-2703

Last updated · South Florida Contractors editorial team · Sources and corrections policy

What do the published Miami benchmarks show?

2025 Miami model job costs, USD; source checked November 12, 2026
ProjectJob costModel scope
Minor kitchen remodel, midrange$29,424200 sq. ft. model kitchen
Major kitchen remodel, midrange$83,468200 sq. ft. model kitchen; materially broader scope
Bathroom remodel, midrange$25,5655 × 7 ft. model bathroom
Asphalt-shingle roof replacement$39,72930 roofing squares model scope
Metal roof replacement$64,1423,000 sq. ft. model scope

Source: JLC / Zonda 2025 Cost vs. Value, Miami. Read the source's project specifications before comparing a proposal. These values are distinct modeled projects; the difference between two rows is not a statistical price range.

Can I apply these prices to Boca Raton or Fort Lauderdale?

Use them as scope references, not city estimates. A condo kitchen, a structural renovation and a finish refresh differ in access, systems, materials and approvals. Ask bidders to price the same written scope, identify exclusions and state when the quote expires. Our cost guides provide additional dated sources and units.

When will original SFC cost data be published?

No original SFC project-cost survey is claimed in this report. A defensible release needs consenting, documented quotes or completed projects, a defined collection period, comparable scopes, sample sizes and a method for excluding duplicates. Publish city-specific medians only when a sufficient sample supports them; otherwise aggregate transparently or state that evidence is insufficient.

What will the collection include?

  1. Record project city, property type, scope, quantity and unit, finish level, quote date and price in USD.
  2. Separate quoted from final paid prices, and show tax, design, permits, demolition, disposal and contingency inclusions.
  3. Remove personal details from publication and retain consent and source documents privately.
  4. Publish sample size, median and distribution only for genuinely comparable observations; explain outliers and missing data.
  5. Review quarterly without changing evidence dates merely because the page is rebuilt.

What is excluded?

Permit turnaround medians and local neighborhood price premiums are not published without observed data. Directory phone leads, sponsored placements and imported license totals are not evidence of construction prices. Compare written estimates and confirm the permit authority for your property.

Your next step

Bring your project into focus.

Start a project request