Last updated · South Florida Contractors editorial team · Sources and corrections policy

Whole-home work needs a defined room and systems schedule. A Miami-Dade/Broward contractor publishes $150–$300 per square foot for mid-range renovation and $250–$500 for a full gut. The distinction is the work being replaced, not just the finish color.

Scope before price

What the numbers cover.

Whole-home remodeling: published benchmarks and planning allowances
Project scopePlanning priceHow to read it
Cosmetic refresh$75–$150 / sq. ft.Limited renewal; establish what remains.
Mid-range renovation$150–$300 / sq. ft.Defined room and systems scope.
Full gut$250–$500 / sq. ft.Extensive replacement; investigate existing conditions.
Luxury full gut$500–$800+ / sq. ft.Premium specification; the upper figure is not a cap.

Benchmarks reviewed November 12, 2026. Final pricing depends on the property and written scope. Read the pricing basis and sources.

Define in the base quote

  • Define every room, system and finish being renewed.

Confirm separately

  • Identify design, approvals, external works, temporary housing and contingency in the total budget.
Budget in context

A 2,000-square-foot mid-range renovation

2,000 sq. ft. × $150–$300 = $300,000–$600,000

Illustrative scope allowance. Do not add kitchen and bath budgets again when those rooms are already included.

Typical planning ranges

Project scopePlanning price
Cosmetic whole-home refresh (surfaces and finishes, no layout changes)$75,000 – $175,000
Full whole-home renovation (kitchen, baths, systems, finishes)$175,000 – $400,000
Whole-home gut renovation with layout changes$350,000 – $700,000
Luxury whole-home transformation$700,000 and up

These ranges are general planning figures for South Florida projects. Your actual cost depends on your home, your scope, and your finishes, and is confirmed by a contractor's estimate after a walkthrough.

What drives the cost

  1. Scope of layout changes. Moving walls, kitchens, and bathrooms costs more than updating in place.
  2. Systems. Electrical, plumbing, and HVAC replacement in older homes is often the largest hidden line.
  3. Finishes. Cabinetry, stone, flooring, and fixtures set the ceiling on the budget.
  4. The home's condition. Structural repairs, water damage, and code corrections discovered during demolition add cost.

Typical timeline: most whole-home renovations take 4 to 9 months of construction depending on scope, permitting, and inspections, after a design and pre-construction phase.

01

Build one scope schedule

List the intended work room by room, then add the property-wide systems. Mark what stays. This prevents double-counting a kitchen or bathroom already included in a larger renovation allowance.

02

Resolve unknowns before fixing a price

Ask what surveys or investigations are needed to make the proposal dependable. Record unresolved items and how each will be priced. Set a written change-approval process before work begins.

03

Compare renovation alternatives on the same basis

If you are considering a larger rebuild, use the same accommodation, site and finish assumptions in both comparisons. Keep financing and temporary living arrangements visible in your own budget, even where they are outside the contractor's agreement.

Bring this to the conversation

Three questions for your estimate.

  1. Which rooms, systems and external works are included?
  2. What investigations remain before the price can be fixed?
  3. Which allowances and owner costs sit outside this total?
Read our estimate comparison guide

what moves the number most is the room-by-room scope and the condition of the roof, electrical, plumbing and hvac. a mid-range remodel at 150 to 300 dollars per square foot assumes the systems are sound. structural work, plumbing and electrical upgrades, roofing and hvac sit outside that range and should be confirmed separately in writing.

Check the property’s jurisdiction.

Permit and inspection requirements depend on the location and work involved. Confirm requirements with the city or county building department before work begins. A permit exemption does not by itself remove trade licensing, zoning or code requirements.

County resources are a starting point. A property inside a municipality may use its city’s building department.

Verify Florida professional and contractor licenses

Direct answers

Frequently asked questions

Should I add a separate kitchen budget?

Only if the whole-home scope excludes it. Ask for a room schedule to avoid counting the same work twice.

Is a cosmetic refresh a full gut?

No. Compare what is retained and replaced before comparing unit prices.

Does the calculator estimate a whole-home renovation?

It calculates selected component projects. Use a contractor's coordinated whole-home proposal when several rooms and systems are being changed together.

does the per-square-foot figure include permits.

no. permits, structural work and system upgrades sit outside the per-square-foot range, so ask the contractor to confirm each one separately in the written proposal.

Behind the estimate

Pricing basis & sources

JMK Contractor provides the table's Miami-Dade/Broward scope bands. MSA Premier separately describes Broward/Palm Beach top-to-bottom work at $150–$275 per square foot and premium specifications at $275–$425. These scopes are not interchangeable regional averages.

These are researched planning ranges and advertised examples, not statistical market averages or contractor offers from this directory. We do not apply an assumed county markup or claim that every city has the same price. Compare written local estimates for the same scope.

  1. JMK Contractor — Miami whole-home renovation costs Source of the scope bands in the table.
  2. MSA Premier — full-home renovation Separate Broward and Palm Beach comparison with a defined top-to-bottom scope.
Sources reviewed November 12, 2026. Provider prices and package terms can change.